US 412 E over BUFFALO DRAIN DTCH

S 1 T 18 N R 9 E · County 069, Missouri · Built 1948 · 2 Lanes · 9,424 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
6169
Year Built
1948
Length
8.8 m (28.9 ft)
Max Span
3.7 m
Lanes
2
Daily Traffic
9,424
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.