MO 124 E over PERCHE CRK

S 17 T 50 N R 13 W · County 019, Missouri · Built 1953 · 2 Lanes · 2,794 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
6118
Year Built
1953
Reconstructed
2009
Length
68.3 m (224.1 ft)
Max Span
24.4 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
2,794
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,127,000
Total Project Cost
$1,690,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.