RT DD S over SCHIERBAUM CR

S 15 T 46 N R 2 E · County 183, Missouri · Built 1943 · 2 Lanes · 11,054 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
6059
Year Built
1943
Length
11.6 m (38.1 ft)
Max Span
3.7 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
11,054
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$204,000
Total Project Cost
$306,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.