MO 41 S over DRAIN DTCH

S 35 T 53 N R 21 W · County 033, Missouri · Built 1939 · 2 Lanes · 1,096 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
6029
Year Built
1939
Reconstructed
1984
Length
24.4 m (80.1 ft)
Max Span
11.9 m
Width
7 m (23 ft)
Lanes
2
Daily Traffic
1,096
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$626,000
Total Project Cost
$939,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.