US 54 E over BR OF POMME DE TER

S 24 T 37 N R 23 W · County 085, Missouri · Built 1938 · 2 Lanes · 2,106 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
5915
Year Built
1938
Length
7.7 m (25.3 ft)
Max Span
3.7 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
2,106
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.