BU 65 S over CST EAST TRFY BNSF RR

S 18 T 29 N R 21 W · County 077, Missouri · Built 1938 · 4 Lanes · 32,275 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
5869
Year Built
1938
Reconstructed
1987
Length
251.2 m (824.1 ft)
Max Span
16 m
Width
17.9 m (58.7 ft)
Lanes
4
Daily Traffic
32,275
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.