MO 79 S over BARLEY CR

S 22 T 50 N R 2 E · County 113, Missouri · Built 1938 · 2 Lanes · 2,989 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
5789
Year Built
1938
Length
9.1 m (29.9 ft)
Max Span
3 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
2,989
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.