MO 25 S over WHITEWATER CHNL

S 8 T 29 N R 12 E · County 031, Missouri · Built 1940 · 2 Lanes · 4,210 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
5729
Year Built
1940
Length
34.4 m (112.9 ft)
Max Span
11.4 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
4,210
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$902,000
Total Project Cost
$1,353,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.