MO 114 E over UP RR

S 23 T 23 N R 10 E · County 207, Missouri · Built 1934 · 2 Lanes · 2,605 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
5637
Year Built
1934
Length
42.7 m (140.1 ft)
Max Span
14.2 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
2,605
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$744,000
Total Project Cost
$1,116,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.