US 54 E over CAMP BR

S 23 T 36 N R 27 W · County 039, Missouri · Built 1932 · 2 Lanes · 2,390 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
5599
Year Built
1932
Reconstructed
1999
Length
9.8 m (32.2 ft)
Max Span
3 m
Lanes
2
Daily Traffic
2,390
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.