MO 7 S over CUSICK CR

S 15 T 43 N R 29 W · County 037, Missouri · Built 1932 · 4 Lanes · 15,687 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
5583
Year Built
1932
Reconstructed
1992
Length
7.6 m (24.9 ft)
Max Span
3.7 m
Lanes
4
Daily Traffic
15,687
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.