US 63 S over HAPPY HOLLOW

S 8 T 30 N R 9 W · County 215, Missouri · Built 1931 · 2 Lanes · 8,822 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
5478
Year Built
1931
Reconstructed
1955
Length
10.4 m (34.1 ft)
Max Span
3 m
Lanes
2
Daily Traffic
8,822
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.