OR 270 E over BNSF RR

S 34 T 47 N R 7 E · County 189, Missouri · Built 1931 · 2 Lanes · 2,088 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
5408
Year Built
1931
Reconstructed
1979
Length
42.4 m (139.1 ft)
Max Span
12.6 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
2,088
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.