MO 22 E over SALING BR

S 33 T 52 N R 12 W · County 007, Missouri · Built 1930 · 2 Lanes · 3,488 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
5329
Year Built
1930
Reconstructed
1954
Length
38.7 m (127 ft)
Max Span
12.2 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
3,488
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,005,000
Total Project Cost
$1,507,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.