MO 164 E over CYPRESS DRAIN DTCH

S 4 T 16 N R 8 E · County 069, Missouri · Built 1929 · 2 Lanes · 737 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
5312
Year Built
1929
Length
29.9 m (98.1 ft)
Max Span
9.9 m
Width
7 m (23 ft)
Lanes
2
Daily Traffic
737
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$505,000
Total Project Cost
$757,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.