MO 25 S over DRAIN DTCH NO 25

S 32 T 29 N R 11 E · County 031, Missouri · Built 1926 · 2 Lanes · 4,210 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
5203
Year Built
1926
Length
21.6 m (70.9 ft)
Max Span
11 m
Width
7 m (23 ft)
Lanes
2
Daily Traffic
4,210
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$627,000
Total Project Cost
$941,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.