US 160 E over MUDDY FK OF SPRING

S 14 T 31 N R 29 W · County 011, Missouri · Built 1928 · 1 Lanes · 1,170 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
5165
Year Built
1928
Length
78.6 m (257.9 ft)
Max Span
16 m
Width
7 m (23 ft)
Lanes
1
Daily Traffic
1,170
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,151,000
Total Project Cost
$1,727,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.