US 36 W over CST SOUTHWEST PKWY

S 22 T 57 N R 35 W · County 021, Missouri · Built 1961 · 2 Lanes · 11,589 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
515
Year Built
1961
Reconstructed
1987
Length
50.9 m (167 ft)
Max Span
18.3 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
11,589
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$829,000
Total Project Cost
$1,244,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.