RT T E over PORTAGE BYU

S 31 T 21 N R 13 E · County 143, Missouri · Built 1928 · 2 Lanes · 6,067 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
5137
Year Built
1928
Reconstructed
1957
Length
38.1 m (125 ft)
Max Span
12.9 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
6,067
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$670,000
Total Project Cost
$1,005,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.