MO 76 E over DRY BR OF SHOAL CR

S 29 T 23 N R 28 W · County 009, Missouri · Built 1926 · 2 Lanes · 1,754 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
5001
Year Built
1926
Length
10.1 m (33.1 ft)
Max Span
9.1 m
Width
7 m (23 ft)
Lanes
2
Daily Traffic
1,754
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$244,000
Total Project Cost
$366,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.