US 160 E over W FORK

S 26 T 32 N R 32 W · County 011, Missouri · Built 1925 · 2 Lanes · 2,224 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
4893
Year Built
1925
Reconstructed
1932
Length
24.1 m (79.1 ft)
Max Span
8.1 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
2,224
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$470,000
Total Project Cost
$705,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.