US 160 E over DRY CR

S 10 T 23 N R 3 W · County 149, Missouri · Built 1925 · 2 Lanes · 1,114 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
4889
Year Built
1925
Length
30.8 m (101 ft)
Max Span
6.1 m
Width
7.1 m (23.3 ft)
Lanes
2
Daily Traffic
1,114
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$742,000
Total Project Cost
$1,113,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.