MO 49 S over UP RR

S 25 T 31 N R 3 E · County 093, Missouri · Built 1927 · 2 Lanes · 973 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
4779
Year Built
1927
Length
38.7 m (127 ft)
Max Span
11.7 m
Width
7 m (23 ft)
Lanes
2
Daily Traffic
973
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$910,000
Total Project Cost
$1,366,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.