US 36 E over E YELLOW CR OVRFL

S 12 T 57 N R 19 W · County 115, Missouri · Built 1955 · 2 Lanes · 4,750 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
4712
Year Built
1955
Length
49.9 m (163.7 ft)
Max Span
18.3 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
4,750
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$817,000
Total Project Cost
$1,226,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.