RT D E over US 67
S 25 T 46 N R 5 E · County 189, Missouri · Built 1961 · 6 Lanes · 24,533 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
38.696439, -90.408761
This bridge is in worse condition than 95.9% of bridges in County 189. The average bridge in Missouri is 0 years old; this one is 65 years old.
Nearby Bridges
RT D E over UP RR
Built 2004
RT D W over UP RR
Built 2004
LINK AVE over MIDLAND CR
Built 1986
DORSETT RD E over US 67
Built 2019
LACKLAND RD over E TRIB OF FEE FEE
Built 2018
RT D E over FEE FEE CR
Built 1966
SCHUETZ RD over TRIB OF FEE FEE CR
Built 1997
CRESTED VIEW DR over E TRIB OF FEE FEE
Built 1978
ASHBY RD over ST LOUIS SW RR
Built 1968
ASHBY RD over MIDLAND BLVD
Built 1993
Bridge Details
- Structure #
- 468
- Year Built
- 1961
- Reconstructed
- 1987
- Length
- 62.5 m (205.1 ft)
- Max Span
- 16.5 m
- Width
- 27.6 m (90.6 ft)
- Lanes
- 6
- Daily Traffic
- 24,533
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,578,000
- Total Project Cost
- $3,868,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.