RT D E over US 67

S 25 T 46 N R 5 E · County 189, Missouri · Built 1961 · 6 Lanes · 24,533 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
468
Year Built
1961
Reconstructed
1987
Length
62.5 m (205.1 ft)
Max Span
16.5 m
Width
27.6 m (90.6 ft)
Lanes
6
Daily Traffic
24,533
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,578,000
Total Project Cost
$3,868,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.