IS 29 N over NODAWAY RVR

S 36 T 60 N R 37 W · County 003, Missouri · Built 1953 · 2 Lanes · 11,937 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
4660
Year Built
1953
Reconstructed
1993
Length
278.9 m (915 ft)
Max Span
42.7 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
11,937
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,795,000
Total Project Cost
$5,692,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.