MO 51 S over DRAIN DTCH NO 17

S 29 T 25 N R 8 E · County 023, Missouri · Built 1940 · 2 Lanes · 2,141 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
4586
Year Built
1940
Length
14.9 m (48.9 ft)
Max Span
5 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
2,141
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$313,000
Total Project Cost
$470,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.