US 63 S over MUSTION CR

S 35 T 24 N R 8 W · County 091, Missouri · Built 1952 · 2 Lanes · 6,121 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
4471
Year Built
1952
Length
57.3 m (188 ft)
Max Span
11.4 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
6,121
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,561,000
Total Project Cost
$2,341,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.