MO 370 W over CST PREMIER PKWY

S 735 T 47 N R 4 E · County 183, Missouri · Built 1995 · 3 Lanes · 15,378 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
4295
Year Built
1995
Length
62.5 m (205.1 ft)
Max Span
21.5 m
Width
18.3 m (60 ft)
Lanes
3
Daily Traffic
15,378
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.