IS 55 S over CST GREEN PARK RD

S 26 T 44 N R 6 E · County 189, Missouri · Built 1962 · 4 Lanes · 53,950 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
419
Year Built
1962
Reconstructed
2024
Length
74.1 m (243.1 ft)
Max Span
20.4 m
Width
19.7 m (64.6 ft)
Lanes
4
Daily Traffic
53,950
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.