MO 370 W over COLE CR

S 13 T 47 N R 4 E · County 183, Missouri · Built 1994 · 4 Lanes · 21,656 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
4123
Year Built
1994
Length
95.1 m (312 ft)
Max Span
19.3 m
Width
21.2 m (69.6 ft)
Lanes
4
Daily Traffic
21,656
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.