US 61 S over WALKER CR

S 2199 T 30 N R 13 E · County 031, Missouri · Built 1990 · 4 Lanes · 28,994 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
4020
Year Built
1990
Length
15.3 m (50.2 ft)
Max Span
3.7 m
Lanes
4
Daily Traffic
28,994
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.