MO 370 E over CST MISSOURI BOTTOM RD

S 2038 T 47 N R 5 E · County 189, Missouri · Built 1990 · 6 Lanes · 46,401 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
3986
Year Built
1990
Length
109.1 m (357.9 ft)
Max Span
37.8 m
Width
35.2 m (115.5 ft)
Lanes
6
Daily Traffic
46,401
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.