DR MARTIN LUTHER K over CST S LENORE K SULLIVA

S 13 T 45 N R 7 E · County 510, Missouri · Built 1951 · 4 Lanes · 6,991 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
3954
Year Built
1951
Reconstructed
1988
Length
1222.2 m (4009.8 ft)
Max Span
293.5 m
Width
13.3 m (43.6 ft)
Lanes
4
Daily Traffic
6,991
Material
Steel Continuous
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$96,314,000
Total Project Cost
$144,471,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.