BU 61 N over US 24

S 1 T 57 N R 6 W · County 127, Missouri · Built 1960 · 2 Lanes · 1,448 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
387
Year Built
1960
Reconstructed
2010
Length
73.5 m (241.1 ft)
Max Span
20.2 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
1,448
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,032,000
Total Project Cost
$1,548,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.