TOWNSHIP LINE RD over BR OF CAMP CR

S 33 T 48 N R 3 W · County 219, Missouri · Built 2021 · 2 Lanes · 75 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
37504
Year Built
2021
Length
7.3 m (24 ft)
Max Span
7 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
75
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.