MISSOURI TRAIL over FOREST LAKE TRIB

S 8 T 62 N R 15 W · County 001, Missouri · Built 2024 · 2 Lanes · 40 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 9 Excellent

Location

40.193514, -92.609008

This bridge is in worse condition than 10.3% of bridges in County 001. The average bridge in Missouri is 0 years old; this one is 2 years old.

Nearby Bridges

Bridge Details

Structure #
37419
Year Built
2024
Length
12.2 m (40 ft)
Max Span
11.7 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
40
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.