ROUND MOUNTAIN RD over TRIB TO BULL CRK

S 2 T 24 N R 21 W · County 213, Missouri · Built 2024 · 2 Lanes · 50 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
37309
Year Built
2024
Length
8.5 m (27.9 ft)
Max Span
4.3 m
Width
6.7 m (22 ft)
Lanes
2
Daily Traffic
50
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.