MO 19 S over GLADDEN CR

S 34 T 33 N R 5 W · County 065, Missouri · Built 2024 · 2 Lanes · 896 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 9 Excellent

Location

37.517614, -91.469147

This bridge is in worse condition than 43.4% of bridges in County 065. The average bridge in Missouri is 0 years old; this one is 2 years old.

Nearby Bridges

Bridge Details

Structure #
37285
Year Built
2024
Length
34.6 m (113.5 ft)
Max Span
33.5 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
896
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.