CRD YATER over DRYWOOD CROOK

S 21 T 34 N R 33 W · County 217, Missouri · Built 2024 · 2 Lanes · 40 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
37273
Year Built
2024
Length
52.3 m (171.6 ft)
Max Span
37 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
40
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.