NE 272ND ST over SHOAL CR

S 18 T 55 N R 30 W · County 049, Missouri · Built 2024 · 2 Lanes · 60 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
37253
Year Built
2024
Length
27.7 m (90.9 ft)
Max Span
27.1 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
60
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.