RT D S over BYRD CRK

S 20 T 32 N R 12 E · County 031, Missouri · Built 2024 · 2 Lanes · 888 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
37234
Year Built
2024
Length
59.1 m (193.9 ft)
Max Span
25.9 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
888
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.