PACIFIC SCHOOL RD over LAKE CRK

S 28 T 44 N R 20 W · County 159, Missouri · Built 2023 · 2 Lanes · 25 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 9 Excellent
Substructure 9 Excellent

Location

38.553764, -93.125722

This bridge is in worse condition than 32% of bridges in County 159. The average bridge in Missouri is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
37150
Year Built
2023
Length
34.1 m (111.9 ft)
Max Span
32.9 m
Width
6.9 m (22.6 ft)
Lanes
2
Daily Traffic
25
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.