KING HILL DRIVE over BARBARA ST

S 32 T 57 N R 35 W · County 021, Missouri · Built 2023 · 2 Lanes · 120 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
37143
Year Built
2023
Length
27.3 m (89.6 ft)
Max Span
26.2 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
120
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.