MCGEHAN RD over TRIB OF JOACHIM CR

S 26 T 39 N R 4 E · County 099, Missouri · Built 2023 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
37016
Year Built
2023
Length
20.2 m (66.3 ft)
Max Span
18.9 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.