MO 163 S over BONNE FEMME CRK

S 9 T 47 N R 12 W · County 019, Missouri · Built 2023 · 2 Lanes · 1,452 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 9 Excellent

Location

38.868647, -92.270408

This bridge is in worse condition than 19.4% of bridges in County 019. The average bridge in Missouri is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
36960
Year Built
2023
Length
24.2 m (79.4 ft)
Max Span
24.2 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
1,452
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.