COUNTY ROAD 225 over DRAIN DITCH 64

S 20 T 20 N R 11 E · County 155, Missouri · Built 2018 · 1 Lanes · 15 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
36905
Year Built
2018
Length
11.4 m (37.4 ft)
Max Span
11.4 m
Width
5.5 m (18 ft)
Lanes
1
Daily Traffic
15
Material
Steel
Design
Other
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.