US 60 E over MO 125

S 21 T 28 N R 20 W · County 077, Missouri · Built 2024 · 4 Lanes · 26,727 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
36900
Year Built
2024
Length
55.9 m (183.4 ft)
Max Span
27.4 m
Width
24.6 m (80.7 ft)
Lanes
4
Daily Traffic
26,727
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.