FARM RD 2040 over S FK CAPPS CK

S 17 T 25 N R 28 W · County 009, Missouri · Built 2023 · 2 Lanes · 150 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
36741
Year Built
2023
Length
30.5 m (100.1 ft)
Max Span
14.6 m
Width
6.2 m (20.3 ft)
Lanes
2
Daily Traffic
150
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.