IS 270 W over RT AC

S 31 T 47 N R 7 W · County 189, Missouri · Built 2022 · 4 Lanes · 37,303 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
9
Excellent

Bridge Details

Structure #
36726
Year Built
2022
Length
50.3 m (165 ft)
Max Span
48.6 m
Width
20.6 m (67.6 ft)
Lanes
4
Daily Traffic
37,303
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.